Breakdown of Project Resources (Viewable to Planner, Consolidate, Full Control only)

Select Cost Estimate

           
Project Code/ Name:   Cost Estimate Name:   Prepared By:  
Assigned By/ Date:   Assigned to/ Date:   Reviewed By/ Date:
Consolidated By/ Date:   Client Name:   Currency:  
       


PRINT PREVIEW | SEND FOR REVIEW/SENT
RES Resource/ Item/ S-Item Estimated Unit Unit RES Cost RES Cost RES Cost
Code Description Quantity   Rate for S-Item for Project as % of Project
xx xx xx xx xx xx   xx
xx xx xx xx xx xx   xx
xx xx xx xx xx xx   xx
xx xx xx xx xx xx   xx
xx xx xx xx xx xx   xx
               
  TOTAL COST (From This Table)            
  TOTAL COST (Check with Cost Estimate)            
  TOTAL PERCENTAGE            


1. Calculations are done without addons.
2. This breakdown/ schedule assumes that the weights stay the same before or after addons.

3. All items or sub-Items without assigned resources are considered as done by Vendors/ Subtrades.