BREAKDOWN OF Project Resources

           
Project Code/ Name:   Cost Estimate Name:   Prepared By:  
Assigned By/ Date:   Assigned to/ Date:   Reviewed By/ Date:
Consolidated By/ Date:   Client Name:   Currency:  
       


RES Resource/ Item/ S-Item Estimated Unit Unit RES RES RES
Code Description Quantity   Rate Cost/ S-Item Cost/ ResType as % of Project
xx xx xx xx xx xx   xx
xx xx xx xx xx xx   xx
xx xx xx xx xx xx   xx
xx xx xx xx xx xx   xx
xx xx xx xx xx xx   xx
               
  TOTAL COST (From This Table)            
  TOTAL COST (Check with Cost Estimate)            
  TOTAL PERCENTAGE            


1. Calculations are done without addons.
2. This breakdown/ schedule assumes that the weights stay the same before or after addons.